Center for Engineering and Planning — CEP

Projects / Water Supply, Transmission and Distribution

Rehabilitation of Water Network in Different Areas in Khan Younis

Client / financing
American Near East Refugee Aid (ANERA) Financed through United States Agency for International Development (USAID)
Location
Palestine
Dates
2018
Water Supply, Transmission and DistributionEnvironment Issues

Project Overview

This project aimed at rehabilitating approximately 20 km of water networks in various areas of Khan Younis, Gaza Strip. The scope included the preparation of detailed design drawings, tender documents, and associated technical documentation to guide the rehabilitation works, ensuring the efficiency and sustainability of the water supply system.

Role of CEP on the Project:

Prepared detailed design drawings for the rehabilitation of the water networks, ensuring the plans met local and international standards.

Developed a complete set of tender documents, including technical specifications, cost estimates, and project timelines to guide the procurement process.

Compiled a list of required materials for the rehabilitation works, ensuring compliance with quality standards.

Conducted an Environmental Impact Assessment (EIA) to assess the project's impact on the local environment and recommend mitigation measures.