Center for Engineering and Planning — CEP

Projects / Health Facilities

Design and Construction Supervision of Pediatric Cancer Center in Gaza

Client / financing
Palestine Children’s Relief Fund (PCRF)
Location
Palestine
Dates
2015–2018
Health FacilitiesHousing and Public BuildingsArchitectural and Spatial Planning

Project Description

The project involved the expansion of the existing Rantisi Hospital by adding two additional floors to accommodate a Pediatric Cancer Center. The center provided specialized care for children battling cancer. The project included the full furnishing and installation of medical equipment, along with necessary rehabilitation works to upgrade the hospital's infrastructure.

The center spanned a main floor area of approximately 2,400 m² and featured various facilities, including inpatient wards, isolation rooms, medical staff facilities, outpatient clinics, medical lab and storage facilities. The works also included extensive design and construction activities, covering architectural, structural, mechanical, electrical, medical, power supply, control systems, networking, HVAC, firefighting systems, and elevators.

Role of CEP in the Project

Complete Design and Rehabilitation: CEP developed the complete design for the pediatric cancer center, ensuring that all aspects—architectural, structural, medical, and technical—met the highest healthcare standards.

Tender Documents: CEP prepared detailed tender documents according to FIDIC Red Book, ensuring transparency and a competitive bidding process.

Tender Evaluation and Awarding: CEP managed the evaluation and awarding of tenders to ensure the selection of the most qualified contractor.

Construction Supervision: CEP supervised the entire construction process, ensuring that the works were completed on time, within budget, and to the required quality standards.