Center for Engineering and Planning — CEP

Projects / Housing and Public Buildings

Project Management & Engineering Supervision of Gaza Reconstruction Program for the Kuwait Government Grant for the Financing of Gaza Reconstruction in the State of Palestine ($200 M)

Client / financing
National Office for Gaza Reconstruction (NORG)
Location
Palestine
Dates
2016–2019
Housing and Public BuildingsRoads and TransportationIndustrial FacilitiesHealth FacilitiesEducational Facilities and ProgramsWater Supply, Transmission and DistributionIrrigation Schemes and SystemsControl and Telecommunications Systems

Project Overview

The Gaza Reconstruction Program, funded by the Kuwait Government, aimed to alleviate the impact of the 2014 Israeli aggression on the Gaza Strip, with a total funding of $200 million. The program included projects across multiple sectors, such as housing, infrastructure, economic, agriculture, water, health, and education, targeting both reconstruction and infrastructure improvements in Gaza. The reconstruction efforts focused on restoring damaged facilities and improving the overall resilience of the region.

The scope covered reconstruction and rehabilitation in areas like housing (2,200 units), municipal and industrial infrastructure, agricultural facilities, health services, and education. A major project within the water sector included the construction of a main carrier line for drinking water, along with pumping stations and distribution networks to serve Gaza.

Role of CEP in the project

Description of Actual Services Provided:

Assist the concerned Ministries and authorities in preparing for the reconstruction program.

Review the design and tender documents including drawings, BOQs, specifications, etc.

Insure the completeness of tender documents of projects.

Monitor the bidding stage of the projects and preparation of evaluation reports.

Provide high-level supervision during the construction phase.

Verify the measurements of implemented works and the eligibility for payment.

Monitor the progress in the field and report periodically to the fund.

Review the Interim/Final payments submitted by Contractor/Suppliers and provide recommendation to the Ministerial Committee.

Other managerial and financial duties.

Management of the whole Kuwaiti Grant that included the following sectors:

Housing Sector (75 Million$): It included reconstruction about 2200 housing units that were destroyed in war 2014. The compensated area of the housing units ranged from 100 to 150 square meters.

Infrastructure Sector (35 Million$) with project in the 25 municipalities of Gaza: It was divided into the followings:

Infrastructure municipal projects (25 Million$).

Infrastructure projects for industrial areas (10 Million$).

Economic Sector (9.5 Million$): It was divided into the followings:

Reconstruction about 162 construction industrial facilities and 109 wooden industrial facilities that were destroyed in war 2014 (8.7 Million$).

Supply equipment for MoNE labs (0.8Million $).

Agriculture Sector (5 Million$): it was divided into the followings:

Reconstruction number of agricultural greenhouses (2.85 Million$).

Reconstruction number of livestock bins (1.25 Million$).

Construction of quarantine station (0.8 Million$).

Water Sector (60 Million$): Construction main carrier line for drinkable water characterized by the followings:

Capacity: 110 Million cubic meters.

Length: 20 km.

Diameter: 130 cm.

Distribution network length: 20 km.

Holding tanks for mixing and distribution: 7 tanks with capacity of 5,000 cubic meters.

Pumping stations: 6.

Monitoring and control network were included.

Health Sector (4 Million$): Reconstruction the Maternity Hospital in Al Shifa Medical Complex.

Education Sector (3Million$): It included a number of projects for educational NGOs and orphans centres. It was divided into the followings fields:

Construction new buildings or new stories.

Supply equipment for labs.

Road infrastructure assignments · 2016–2019

Road infrastructure assignments
#Project NameLength (m)Municipality
Rehabilitation of Ahmed Fekri Street800Jabalia
Development of Eastern Jabalia (Zaweya Street And Ajour Area)1300
Development of Omar Bin El Khatab Area2500
Paving of Internal Streets in Beit Lahia 1700Beit Lahia
Development of the Main Street of Bait lahia500
Development of the Sea Street (Atatra-Americia) in Bait Lahia500
Rehabilitation and Development of Al Sultan Abd El Hameed Street And Street #412200Beit Hanoun
Rehabilitation and Development of the Industrial Zone700
Rehabilitation and Development of Al Qaraman Street and Basel Naim Street1200
Rehabilitation and Development of Khalil El Wazeer Street 1400
Maintenance of Internal Roads in Beit Hanoun1000
Rehabilitation and Development of Abd El Dayem Area700
Rehabilitation and Development of Al Banat Street and Mahdeya Shawa Area3800
Rehabilitation of Internal Roads in Om El Nasser1100Om El Nasser
Rehabilitation of Al Shaa'f Street2500Gaza
Rehabilitation of Al Mansoura Street1000
Maintenance of Al Muntar Street 800
Maintenance of Different Roads in Gaza 700
Development of Algeria Street800
Rehabilitation of Industrial Zone Roads4000
Rehabilitation of Northern Area1100Mughraqa
Rehabilitation and Maintenance of the Main Road1100
Rehabilitation and Maintenance of Al Seka Road900
Rehabilitation and Maintenance of Street No. 16400Al Zahra
Rehabilitation of Internal Roads in Wadi Gaza1300Wadi Gaza
Development of El Hadaba Area800Deir El Balah
Development of Industrial Area Roads2400
Maintenance of Internal Roads in Al Nuseirat800Nuseirat
Rehabilitation of Omar Ben Abed El aziz Road1000Zawayda
Development of Al Nuzha And El Salah Streets1000Bureij
Development and Maintenance of Block 1 600Maghazi
Rehabilitation of Street R1-8800Musadar
Pavement of Al Satari Street800Wadi El Salqa
Rehabilitation of Main Roads in Khanyounis500Khanyounis
Rehabilitation of Internal Roads in Khanyounis400
Development of Street No. 3300
Development of Street No. 66500
Development of Street Nos. 101 and 106 – Industrial Zone1800
Rehabilitation of Internal Roads in Al Qarara2400Qarara
Rehabilitation of Al Shohada' Street1500Bani Suhaila
Rehabilitation of Al Shohada' Street #181800Abasan El Kabira
Pavement of Al Radwan Street700Abasan El Jadida
Development of Internal Roads1000Khuza'a
Development of Asphalt Roads – Abu Reida Area1800
Development of Asphalt Roads – Radwan Area2000
Development of Street #181600Fukhari
Maintenance of Main Roads in Rafah1000Rafah
Rehabilitation of "Abu Yusuf El Najar Hospital" Street700
Development of Industrial Zone2000
Rehabilitation of Destroyed Roads in Al Naser Area1000Naser
Rehabilitation of Destroyed Roads in Al Shoka Area500Shoka