Project Overview

This project involved the design and construction supervision of an effluent recovery and irrigation system as part of the North Gaza Emergency Sewage Treatment (NGEST). The solar energy systems designed included 29 systems (500Wp) to feed the recovery wells UPS units, 9 systems (300Wp) for irrigation zones, and 1 system (2000Wp) for the booster station control panel. Additionally, the project included the design of 29 recovery wells, a 5 km collection pipe network, two 5000m³ water tanks, 8 booster pumps (750m³/hr. each), a 100 km irrigation network, as well as administration and service buildings.

Role of CEP in the project

Design of Solar Energy Systems: The office designed the solar systems that powered the recovery wells and irrigation zones.

Preparation of Tender Documents: Detailed specifications and documents for the solar energy systems were prepared.

Construction Supervision: CEP provided oversight to ensure the successful construction and installation of the solar systems and other project components.

Technical Support: CEP assisted during the implementation of the systems, ensuring efficient integration with the overall project.