Design of Solar Energy System for Reconstructive surgeries and emergency room building at Al Awada Hospital

Client / financing
Al Taawon Association
Location
Palestine
Dates
2020
Renewable EnergyElectrical Power Supply, Transmission and DistributionHealth Facilities

Project Overview

This project involved the preparation of detailed design and tender documents for a rooftop solar energy system at Al Awada Hospital. The solar system, with a capacity of approximately 120 kWp, was designed as a hybrid system with a fuel save controller to reduce fuel consumption and enhance energy efficiency for the hospital's reconstructive surgeries and emergency room building.

Role of CEP in the project

Prepared the detailed design for the 120 kWp rooftop solar energy system, ensuring that the design met the hospital's energy needs and operational requirements.

Developed comprehensive tender documents, including technical specifications, drawings, and cost estimates for the system's design and installation.

Integrated a hybrid system with a fuel save controller to optimize energy usage and reduce reliance on conventional power sources.

Provided technical oversight to ensure that the design complied with safety standards and environmental regulations, ensuring the hospital's energy infrastructure was sustainable and reliable.