Gaza City Rainwater Conservation Project

Client / financing
American Near East Refugee Aid (ANERA)
Location
Palestine
Dates
1989–1994
Environment IssuesStormwater Management

Gaza City Rainwater Conservation Project: CEP reviewed the initial designs and specifications for the project and made recommendations concerning the measures that needed to be taken before further implementation was carried out by the Municipality. CEP carried out detailed daily monitoring of the performance of the various project components including the settling basin, the collection pond, the storm water collection conduits and the sewer manholes that most directly impacted the storm water system. CEP produced several technical reports on the general performance of the system including operation and maintenance aspects and it participated in all the discussions relating to the future development and expansion of the project.