Center for Engineering and Planning — CEP

Projects / Water Supply, Transmission and Distribution

Pipes and Fittings Rehabilitation Project- Gaza and Northern Gaza Phase III

Client / financing
Lyonnaise des Eaux / Khatib and Alami (LEKA)
Location
Palestine
Dates
2001
Water Supply, Transmission and Distribution

Pipes and Fittings Rehabilitation Project- Gaza and Northern Gaza Phase III: The project included the design and preparing of tender documents for the rehabilitation of distribution networks in Gaza, Jabalia, Beit Lahia and Beit Hanoun. The project included the construction supervision on the installation of 160 and 110mm UPVC and 50mm MDPE pipes totaling to 51 km with all relevant house connections and fittings.